Research Article
A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory
Table 8
Cost structure for performance measures.
| Cost structure |
| Total cost (TC) | TC = CGP − CLD − CPM | Cost of preventive maintenance (CPM) | CPM = (CC) + (TeC) | Component cost (CC) | CC = (Total_Component_Replaced) * (Cost/Component_Unit) | Technician cost (TeC) | TeC = (Total_Time_Repaired) * (Cost/Hour) | Cost of good product (CGP) | CGP = (Total_Good_Units) * (Cost/Good_Unit) | Cost of lost product (CLD) | CLD = (Total_Lost_Units) * (Cost/Lost_Unit) |
|
|