Research Article
System Identification Based Proxy Model of a Reservoir under Water Injection
Table 4
Lower and upper bounds of input design for modeling fluid production during water injection.
| Well name | Lower bound (Sm3/day) | Upper bound (Sm3/day) |
| Well 1 | 1500 | 4500 | Well 2 | 1750 | 4750 | Well 3 | 2000 | 5000 | Well 4 | 2250 | 5250 | Well 5 | 2500 | 5500 | Well 6 | 2750 | 5750 | Well 7 | 3000 | 6000 | Well 8 | 3250 | 6250 | Well 9 | 3500 | 6500 | Well 10 | 3750 | 6750 | Well 11 | 4000 | 7000 |
|
|