Research Article

Biobjective Scheduling for Joint Parallel Machines with Sequence-Dependent Setup by Taking Pareto-Based Approach

Table 2

Specification of input and condition parameters. means the values being drawn from a uniform distribution of a random variable (RV) between and .

ParameterReferencesSmall problemsLarge problems

{6, 9}{5, 6, 7, 8}{10, 15, 20, 25, 30}
{3, 6}{6, 9, 12}{6, 9}
{2}{2, 3}{4, 6, 8, 10}
Processing time: Fixed (10, 20) (20, 50)
Release time: Fixed (5, 30) (1, 200)
Setup time: Fixed (5, 20) (4, 10)
Demand: Fixed (10, 40) (10, 200)
Machine eligibility: Fixed (0, 1) (0, 1)
Production cost: Fixed (10, 50) (50, 100)
Storage cost: Fixed (10, 50) (50, 100)