Research Article

Determination of Best Criteria to Determine Final and Initial Speeds within Ramp Exercise Testing Protocols

Table 5

Intercept, slope, -square ( ), and standard error of estimate (SEE) for the regression models obtained in ramp protocols initiating with speeds corresponding to 50% of the estimated (CPET1bis), 50% of the measured (CPET2), and 60% of the measure (CPET3).

interceptSlope -SquareSEE
(mL·kg−1·min−1)

versus speed in CPET1bis
versus speed in CPET2
versus speed in CPET3

*Intercept significantly different from zero ( ).
§Slope significantly different from 1.0 ( ).