Research Article

Assessing Hydropower Potential in Nepal’s Sunkoshi River Basin: An Integrated GIS and SWAT Hydrological Modeling Approach

Table 4

Total power distribution in subbasins.

SNSubbasinCatchment area (km2)Power at Q40 (MW)

113322.4042.29
214175.8891.87
315685.6382.77
416628.4882.83
517197.5828.90
618119.991.58
820108.2839.84
922138.651.20
Total371.30