Research Article

Consider the Consequences: A Risk Assessment Approach for Industrial Control Systems

Table 4

Static risk for the test network.

EventLikelihood (%)ConsequenceRisk
Ch. ASystemGlobalCh. ASystemGlobal

2.49100.00%25.00%24.49%2.490.620.61
2.3841.67%10.67%10.20%0.990.250.24
3.90100.00%25.00%24.49%3.900.980.96
3.90100.00%25.00%24.49%3.900.980.96

2.49100.00%25.00%25.00%2.490.620.62
2.3850.00%12.50%12.50%1.190.590.59
3.90100.00%25.00%25.00%3.900.980.98
3.90100.00%25.00%25.00%3.900.980.98