Research Article
Automated Design Space Exploration with Aspen
Figure 4
This chart shows the increase in predicted runtime as a function of the dimension of the volume n and its relation to the specified constraint of five seconds. In addition to overall runtime (CF = control flow), runtime per invocation of each kernel is also shown.