Research Article
Optimal Allocation of Tunnel Safety Provisions Based on a Quantitative Risk Assessment Model
Table 1
The purchase costs, maintenance costs, and operating costs for various types of tunnel safety provisions.
| Tunnel safety provisions | Types | Purchase costs (million SD) | Maintenance costs (million SD per year) | Operating costs (million SD per year) |
| Tunnel ventilation system | Longitudinal | 50 | 5 | 0.8 | Transverse | 80 | 8 | 1.8 |
| Fire detection system | Heat | 4 | 0.4 | 0.1 | Smoke | 8 | 0.8 | 0.1 | AID | 4 | 0.4 | 0.1 |
| Fire verification system | CCTV | 25 | 2.5 | 0.4 | Emergency telephone | 20 | 2 | 0.1 |
|
|