An Extended Flexible Job Shop Scheduling Model for Flight Deck Scheduling with Priority, Parallel Operations, and Sequence Flexibility

Table 4

Supporting group and its supporting operation and supporting time.

Supporting group (Operation, time)Supporting group(Operation, time)

1(A, 2)16(G, 2)
2(A, 3)17(H, 1)
3(B, 2)18(H, 2)
4(B, 2)19(I, 13)
5(C, 3)20(I, 14)
6(C, 2)21(I, 15)
7(D, 4)22(I, 16)
8(D, 5)23(J, 3)
9(E, 11)24(J, 4)
10(E, 12)25(K, 6)
11(E, 10)26(K, 7)
12(E, 11)27(L, 2)
13(F, 7)28(L, 3)
14(F, 8)29(L, 4)
15(G, 4)30(L, 5)