Research Article
A Design That Incorporates Adaptive Reservation into Mixed-Criticality Systems
Figure 22
(a) Overall resource adaptation performance. (b) Partial enlarged view of (a): after the execution of the release period, the resource monitor detects that and thus a new calculation event is triggered immediately based on the dynamic calculation interval policy.
(a) |
(b) |