Research Article

A Design That Incorporates Adaptive Reservation into Mixed-Criticality Systems

Table 2

Overruns and deadline misses.

Period number 0–33–3.63.6–66–7.47.4–1212–14.414.4–25Total

OR (%)0.572.20.500.710.390.880.560.60
DMR (%)00000000