Research Article

Applying Softcomputing for Copper Recovery in Leaching Process

Table 1

Entry parameters to the statistical model.

NotationName and descriptionOptimum values

Monoclass granulometry (refers to the mineral)Between 11,5 mm and 15 mm
Irrigation ratesBetween 14 ()/m2 and 6 /m2
Total acid addedBetween 0,5 g/l and 100 g/l
Pile highBetween 1 m and 5 m
Total copper gradeBetween 0,5% and 2%
CO3 gradeBetween 0,5% and 10%
Leaching ratioLess than 15 m3/TMS in pilot and Less than 8 m3/TMS in plant
Operation daysBetween 90 and 120 days
Soluble copper grade stacked70% of the total copper grade