Research Article

Flexible Job Shop Scheduling Problem Using an Improved Ant Colony Optimization

Table 2

Comparison of the algorithm performances for the actual production instance.

AlgorithmThe best solutionThe worst solutionThe average solutionThe average computing time (s)

The basic ACO283632.49.327
MMAS252826.86.458
IACO252625.25.825