Research Article

Urban Traffic Signal Control Based on Multiobjective Joint Optimization

Table 1

Timing schemes for the SCATS.

Timing schemePhase A green light duration (%)Phase B green light duration (%)Phase C green light duration (%)Phase D green light duration (%)

129242423
235192818
324242626
425242724