Research Article
Energy-Aware Scheduling of Workflow Using a Heuristic Method on Green Cloud
Table 1
Previous studies on energy-aware task scheduling techniques.
| Authors | Proposed method | Target |
| Barzegar et al. [2] | EATSDCD | Reducing the makespan and energy consumed by the processors to perform the tasks in the DAG | Juarez et al. [22] | MHRA | Minimize the energy consumption and makespan | Sofia and GaneshKumar [27] | NSGA-II | Minimizing the energy consumption and makespan from the cloud service | Yang et al. [31] | EISTS | Balance between optimization of makespan as well as energy consumption | Ben Alla et al. [33] | EATSD | Reduce the energy consumption of the cloud resources and optimize the makespan under the deadlines constraints | Peng et al. [34] | DQN | The framework for trade-off optimization energy consumption and task makespan | Yao et al. [35] | EnMORL | Simultaneously minimize the makespan and energy consumption while meeting the budget constraint | Singh et al. [36] | EEWS | Minimizing makespan and maximizing energy conservation while scheduling workflow | Belgacem et al. [37] | S-MOAL | Minimize both the makespan and the cost of using virtual machines |
|
|