Research Article

Subway Tunnel Construction Settlement Analysis Based on the Combination of Numerical Simulation and Neural Network

Table 3

The evaluation results.

ProjectsRisk degree (%)

Water burst71.21
Surrounding rock deformation88.96
Plastic zone99.12
Landslide83.42
Supporting structure82.47