Research Article
Risk Management of Prefabricated Building Construction Based on Fuzzy Neural Network
Table 4
The relationship between the number of hidden layer nodes and the training error and measurement error.
| Number of hidden layer nodes | Error training | Test error |
| 7 | 9.9601e − 006 | 1.5167e − 005 | 8 | 9.9594e − 006 | 1.3938e − 005 | 9 | 9.9254e − 006 | 1.4127e − 005 | 10 | 9.9249e − 006 | 1.5753e − 005 | 11 | 9.9160e − 006 | 1.1991e − 005 | 12 | 9.9061e − 006 | 1.0685e − 005 | 13 | 9.8343e − 006 | 1.5538e − 005 | 14 | 9.8254e − 006 | 1.6156e − 005 | 15 | 9.7783e − 006 | 1.4073e − 005 | 16 | 9.4784e − 006 | 2.9405e − 005 |
|
|