Research Article
Engineering Cost Prediction Model Based on DNN
Table 4
Relationship curve between node and error under single hidden layer.
| Number of hidden layer nodes | Error (%) |
| 10 | 0.83 | 11 | 0.52 | 12 | 0.67 | 13 | 0.48 | 14 | 0.49 | 15 | 0.55 | 16 | 0.8 | 17 | 0.7 | 18 | 0.45 | 19 | 0.53 | 20 | 0.3 | 21 | 0.27 | 22 | 0.38 | 23 | 0.3 | 24 | 0.32 | 25 | 0.54 | 26 | 0.39 | 27 | 0.46 | 28 | 0.34 | 29 | 0.36 | 30 | 0.42 |
|
|