Thermal-Hydraulic Analysis Tasks for ANAV NPPs in Support of Plant Operation and Control

Table 2

Sequence of events for FW turbo-pump actual transient.

Event Recorded time (s)Calculated time (s)

Main FW turbo-pump stop2121
Run-back automatic signal2222
Additional manual run-back7171
Manual closure of FW 3150150
Automatic closure signal of FW1 and 2201196
Reactor scram due to high SG3 level240249