Sequence of events for FW turbo-pump actual transient.
| Event | Recorded time (s) | Calculated time (s) |
| Main FW turbo-pump stop | 21 | 21 | Run-back automatic signal | 22 | 22 | Additional manual run-back | 71 | 71 | Manual closure of FW 3 | 150 | 150 | Automatic closure signal of
FW1 and 2 | 201 | 196 | Reactor scram due to high
SG3 level | 240 | 249 |
|
|