Research Article
Thermal-Hydraulic Analysis Tasks for ANAV NPPs in Support of Plant Operation and Control
Table 3
Features of selected transients (F&B starting time analysis).
| | Starting time of the F&B procedure (s)
| | Case 1 600 s | Case 2 3000 s | Case 3 5100 s | Case 4 5700 s |
| Main FW turbo-pumps stop | 50 | 50 | 50 | 50 | Turbine and reactor stop | 50 | 50 | 50 | 50 | Manual action: RCP stop | 350 | 350 | 350 | 350 | 2 out of 3 SG wide range level reach 6% | 1782 | 1782 | 1782 | 1782 | Manual action: PORV is opened | 2382 | 4782 | 6882 | 7482 | Manual action: HPIS is actuated | 2382 | 4782 | 6882 | 7482 | Clad maximum temperature is reached (clad maximum temperature) | 48 (622 K) | 4220 (628 K) | 7240 (1460 K) | 7610 (1652 K) | Transient end | 13000 | 13000 | 13000 | 13000 |
|
|