Angra 2 NPP LB-LOCA Review.
| Activity | | Date |
| Submission of FSAR with the LOCA
analysis | | 1998 | CNEN’s Preliminary Safety Assessment | | 1998 | GRS Expert Mission-FSAR LBLOCA Analysis and
Uncertainty Method revision | | 1998 | IAEA Expert Mission/Pisa Uni-FSAR
LBLOCA Analysis and Uncertainty Method revision | | 1999 | Issuance of CNEN Preliminary SER
with 27 RAI | | 1999 | GRS Expert Follow-up Mission | | 1999 | Answers to the request of
additional information | | 1999 | Licensing meeting: Utility, Siemens, CNEN, GRS and Pisa University | | 1999 | Submission of Generic Thermal
Mechanics Analysis of Fuel Failures after a LOCA | | 1999 | Submission of Angra 2 Specific
Thermal Mechanics Analysis of Fuel Failures after a LOCA | | 1999 | Emission of CNEN SER about ECCS
Technical Specification | | 2000 | Pisa University Technical Consultancy to CNEN-Regulatory audit analysis | | 2001 | Issuance of CNEN SER: additional RAI on core
nodalization and uncertainty quantification | | 2001 | Independent
LB-LOCA calculation used to check the request of a temporary 6% power uprate | | 2002 |
|
|