Research Article
Approaches, Relevant Topics, and Internal Method for Uncertainty Evaluation in Predictions of Thermal-Hydraulic System Codes
Table 2
CIAU method: subdivision of driving quantities into intervals.
| PWR-DRIVING QUANTITIES | (1) Upper plenum pressure (MPa) | (2) Primary circuit mass inventory (%)(a) | (3) Steam generator pressure (MPa) | (4) Cladding temperature (K) | (5) Core power (%)(a) | (6) Steam generator level (%)(a) |
| Hypercube intervals | 1 | 0.09–0.5 | 10–40 | 0.1–3.0 | 298–473 | 0.5–1.0 | 0–50 | 2 | 0.5–2.0 | 40–80 | 3.0–7.0 | 473–573 | 1.0–6.0 | 50–100 | 3 | 2.0–4.0 | 80–100 | 7.0–9.0 | 573–643 | 6.0–50 | 100–150 | 4 | 4.0–5.0 | 100–120 | — | 643–973 | 50–100 | — | 5 | 5.0–7.0 | — | — | 973–1473 | 100–130 | — | 6 | 7.0–9.0 | — | — | — | — | — | 7 | 9.0–10.0 | — | — | — | — | — | 8 | 10.0–15.0 | — | — | — | — | — | 9 | 15.0–18.0 | — | — | — | — | — |
|
|
(a)Percent of the initial (nominal) value.
|