Review Article

Thermal-Hydraulic System Codes in Nulcear Reactor Safety and Qualification Procedures

Table 2


UNITEXPUNIPI 91BN1OLPSICEA c2m4_lceaJudgment UNIPI/CEA

RTA: pressurizer emptying

TSEEmptying time*s13146R/-
Scram times413841R/E

RTA: steam generators secondary side behaviour

TSEMain feed water off, turbine bypasss595542E/R
SVPDifference between PS and SG 1 SS pressure at 100 sMPa0.420.330.37R/R

SVPSG 1 massKg/(s)
  at the end of subcooled blowdown774/(82)781/(75)761/(82)E/E
 when PS pressure equals SG 1 SS pressure869/(618)938/(408)847/(463)R/R
 when ACC starts804/(2955)802/(3019)788/(3075)E/R
 when LPIS starts938/(5176)1126/(6529)956/(5474)R/R

SYPSG 1 pressureMPa
  at the end of subcooled blowdown7.157.107.05E/E
  when PS pressure equals SS pressure6.957.047.03R/R
  when ACC starts4.113.954.00R/E
  when LPIS starts0.880.830.83E/E

RTA: subcooled blowdown

TSEUpper plenum in sat conditionss83100110R/R
IPABreak flow up to 100 skg152161162R/R

RTA: first dryout occurrence

TSETime of dryouts223722992444E/R
Range of dryout occurrence at various core levelss2237÷24712299÷25182444÷2625R/R