Research Article

RELAP5/MOD3.3 Code Validation with Plant Abnormal Event

Table 3

Time sequence of main events during transient.

EventMeasurementCalculation

Turbine flow reduction0 second–5 seconds0 second–5 seconds
Operator action (start of governor valve opening)16 seconds16 seconds
SI signal on low steamline pressure17 seconds*16.7 seconds
SI pump injection start21 seconds22 seconds
SG power operated relief valve (PORV) opening27 seconds31 seconds
AFW flow actuation42 seconds42 seconds

*based on 25 seconds delay of AFW actuation.