Main Results of Phase IV BEMUSE Project: Simulation of LBLOCA in an NPP
Table 2
Time sequence of imposed events.
| Event | Time (s) |
| Break | 0.0 | SCRAM | 0.0 | Reactor coolant pumps trip | 0.0 | Steam line isolation | 10.0 | Feed water isolation | 20.0 | HPIS | NO |
|
|