Research Article
RELAP5/MOD3.3 Best Estimate Analyses for Human Reliability Analysis
Figure 4
2.54 cm break scenarios with two operator actions: (a) RCS pressure, (b) core cladding temperature, (c) RCS mass inventory, (d) SG no. 1 wide range level, (e) SG no. 1 pressure, (f) mass discharged through SG no. 1 PORV.