Research Article

RELAP5/MOD3.3 Best Estimate Analyses for Human Reliability Analysis

Figure 4

2.54 cm break scenarios with two operator actions: (a) RCS pressure, (b) core cladding temperature, (c) RCS mass inventory, (d) SG no. 1 wide range level, (e) SG no. 1 pressure, (f) mass discharged through SG no. 1 PORV.
797193.fig.004a
(a)
797193.fig.004b
(b)
797193.fig.004c
(c)
797193.fig.004d
(d)
797193.fig.004e
(e)
797193.fig.004f
(f)