Research Article
Nuclear Power Plant Operator Reliability Research Based on Fuzzy Math
Table 2
Fuzzy parameters of LOCA accident of Chinese NPP operators.
| Response time (sec)
| Age (year) | Experience inside/outside a control room (year) | Education (year) |
| | 25.6 | 0/4.33 | 14.67 | | 26.0 | 0/3.67 | 15.67 | | 24.3 | 0/3.33 | 15.0 | | 25.0 | 0/3.33 | 14.67 | | 24.2 | 0/2.33 | 14.33 | | 24.8 | 0/2.67 | 14.67 | | 27.3 | 0/6.33 | 15.0 | | 25.6 | 0/3.33 | 14.67 |
|
|