Research Article

Converting Maturing Nuclear Sites to Integrated Power Production Islands

Figure 1

Site conversion from two thermal to two fast spectrum plants (BR = 0.5).
519538.fig.001a
(a) Thermal reactor spent fuel inventory
519538.fig.001b
(b) Time history of TRU reservoir
519538.fig.001c
(c) TRU reservoir with modified increase in breeding ratio
519538.fig.001d
(d) Time history of the reprocessing
519538.fig.001e
(e) Reprocessing rates needed for continued thermal plant operation
519538.fig.001f
(f) Effect of reducing reprocessing plant size