Research Article

The Best Estimate Plus Uncertainty Challenge in the Current Licensing Process of Present Reactors

Table 2

Excerpt from the list of PIE for Atucha II Chapter 15 of FSAR.

NoTransientSection FSARAdopted evaluation modelClass of accident

Increase in heat removal by the secondary system15.1

2FW system malfunctions that result in an increase in FW Flow (Stuck Open FW Control Valve)15.1.2CSAAOO

Spectrum of steam system piping failures inside and outside of containment (MSLB)15.1.5

5Leak of MS line inside the containment15.1.5.1CSA/RCA/CBADBA
9Inadvertent closing of the moderator cooler bypass CV15.1.7CSAAOO
36Uncontrolled CR withdrawal at the particular Power level that yields the most severe results15.4.2CSAAOO
41Spectrum of rod ejection accidents15.4.7CSADBA

Spectrum of SGTR15.6.3

46Single SG tube rupture (“Bordihn”: SG Tube Failure)15.6.3.1CSADBA
560.1A LOCA cold with sump swell operation15.6.5.1.2.4QADBA

Large break LOCA15.6.5.1.3

572A LOCA cold (DEGB. Different Break Sizes and Positions are investigated)15.6.5.1.3.1CSA/RCA/CBASBDBA
72Leakage on the refueling machine and auxiliary equipment15.8.2RCADBA

Anticipated transients without scram (ATWS)15.9

74Mechanical failure of the control rods in case of emergency power mode15.9.1CSASBDBA