Table 10

Control logic of Test 5-2 [14].

EventCondition

Break Time zero
Generation of scram signal Primary pressure 84% of initial value
PZR heater off Generation of scram signal or PZR liquid level below 2.3 m
Initiation of core power decay curve simulation
Initiation of primary coolant pump coastdown
Turbine trip (closure of stop valve)Generation of scram signal
Closure of main steam isolation valve
Termination of main feedwater
Generation of SI signal Primary pressure below 79% of initial value
Opening and closing of the SG relief valves SG pressures 110%/103%
Initiation of SG secondary-side depressurization by fully opening of the relief valves with auxiliary feedwater 10 minutes after generation of SI signal
Initiation of enhanced SG secondary-side depressurization by fully opening of safety valves Primary pressure below 13% of initial value
Initiation of accumulator system Primary pressure below 29% of initial value