Chronology of the main events in Test 6-1 [7].

EventExp. TRACE

Break valve opened00
Scram signal2620
SI signal2721
Break flow from subcooled to two-phase flow5046
Primary coolant pumps stopped277270
Break flow to single-phase vapor700741
Primary pressure lower than SG pressure, core level decreases784761
Full opening of SG relief valves10901071
Core protection activated12051271
Initiation of Acc system13051225
Initiation of LPSI2893ā€”
End of test32663000