Research Article
Remarks on Consistent Development of Plant Nodalizations: An Example of Application to the ROSA Integral Test Facility
Table 3
Chronology of the main events in Test 6-1 [
7].
| Event | Exp. | TRACE |
| Break valve opened | 0 | 0 | Scram signal | 26 | 20 | SI signal | 27 | 21 | Break flow from subcooled to two-phase flow | 50 | 46 | Primary coolant pumps stopped | 277 | 270 | Break flow to single-phase vapor | 700 | 741 | Primary pressure lower than SG pressure, core level decreases | 784 | 761 | Full opening of SG relief valves | 1090 | 1071 | Core protection activated | 1205 | 1271 | Initiation of Acc system | 1305 | 1225 | Initiation of LPSI | 2893 | ā | End of test | 3266 | 3000 |
|
|