Control logic of Test 6-2 [9].

Event Condition

Break Time zero
Generation of scram signal Primary pressure 84% of initial value
PZR heater off Generation of scram signal or PZR liquid level below 2.3 m
Initiation of core power decay curve simulation
Initiation of primary coolant pump coastdown
Turbine trip (closure of stop valve)Generation of scram signal
Closure of main steam isolation valve
Termination of main feedwater
Generation of SI signal Primary pressure below 79% of initial value
Opening and closing of the SG relief valvesSG pressures 110%/103%
Initiation of auxiliary feedwaterGeneration of SI signal
Initiation of asymmetrical SG secondary-side depressurization as AM action to achieve a depressurization rate of 55 K/h in the primary system30 minutes after generation of SI signal
Initiation of accumulator systemPrimary pressure below 29% of initial value
Initiation of LPSILP pressure below 8% of initial value