Control logic of Test 1 [10].

EventCondition

Close of PZR spray line valves and PZR heaters30 minutes before break
Isolation of PZR by closing surge line valve1 minute before break
Break openingTime zero
Generation of scram signal4 seconds
Initiation of primary coolant pump coastdown
Initiation of core power decay simulation
Turbine trip (closure of stop valve)Generation of scram signal
Closure of main steam isolation valve
Termination of main feedwater
Opening and closing of the SG relief valvesSG pressures 110% and 103%
Initiation of accumulator systemPrimary pressure below 29% of initial value