Control logic of Test 1 [
10].
| Event | Condition |
| Close of PZR spray line valves and PZR heaters | 30 minutes before break | Isolation of PZR by closing surge line valve | 1 minute before break | Break opening | Time zero | Generation of scram signal | 4 seconds | Initiation of primary coolant pump coastdown | | Initiation of core power decay simulation | | Turbine trip (closure of stop valve) | Generation of scram signal | Closure of main steam isolation valve | | Termination of main feedwater | | Opening and closing of the SG relief valves | SG pressures 110% and 103% | Initiation of accumulator system | Primary pressure below 29% of initial value | Initiation of low-pressure injection system | LP pressure below 8% of initial value |
|
|