Research Article
Experimental Studies for the VVER-440/213 Bubble Condenser System for Kola NPP at the Integral Test Facility BC V-213
Table 5
Chronology of events during LB LOCA.
| Time, sec | Event |
| 0.0 | Double-ended guillotine break | 0.0 | Total loss of electricity | 0.0 | Turbine isolation begins | 0.03 | Scram signal | 0.1 | More then three main coolant pumps dropped out | 4.76 | Pressurizer pressure <10,8 MPa | 5.41 | Start of hydroaccumulator injection to downcomer | 5.46 | Start of hydroaccumulator injection to upper plenum | 6.99 | Pressurizer level <2.76 m | 8.22 | Pressurizer level <2.26 m | 16.00 | Start of high-pressure injection system | 32.90 | Start of low-pressure injection system |
|
|