Review Article
Analyses of the OSU-MASLWR Experimental Test Facility
Table 2
Summary of the previous OSU-MASLWR testing program [
8,
11,
13].
| Name of the test | Type of test | ADS line configuration | Middle | Middle | High | High | Sump | Sump | ADS 1 | ADS2 | ADS 1 | ADS2 | Recirc 1 | Recirc 2 | (%) | (%) | (%) | (%) | (%) | (%) |
| OSU-MASLWR-00l | Inadvertent actuation of 1 submerged ADS valve. | Failed Shut | 100 | 100 | 100 | 100 | 100 | OSU-MASLWR-002 | Natural circulation at core power up to 210 kW. | N/A | N/A | N/A | N/A | N/A | N/A | OSU-MASLWR-003A | Natural circulation at core power of 210 kW. (Continuation of test 002, establishing the initial conditions for the 003B test.) | Failed Shut | N/A | N/A | N/A | N/A | N/A | OSU-MASLWR-003B | Inadvertent actuation of 1 high-containment ADS valve | Failed Shut | 100 | Failed Shut | 100 | 100 | 100 |
|
|