Review Article

Analyses of the OSU-MASLWR Experimental Test Facility

Table 2

Summary of the previous OSU-MASLWR testing program [8, 11, 13].

Name of the testType of testADS line configuration
MiddleMiddleHighHighSumpSump
ADS 1ADS2ADS 1ADS2Recirc 1Recirc 2
(%)(%)(%)(%)(%)(%)

OSU-MASLWR-00lInadvertent actuation of 1 submerged ADS valve.Failed Shut100100100100100
OSU-MASLWR-002Natural circulation at core power up to 210 kW.N/AN/AN/AN/AN/AN/A
OSU-MASLWR-003ANatural circulation at core power of 210 kW. (Continuation of test 002, establishing the initial conditions for the 003B test.)Failed ShutN/AN/AN/AN/AN/A
OSU-MASLWR-003BInadvertent actuation of 1 high-containment ADS valveFailed Shut100Failed Shut100100100