Review Article

Analyses of the OSU-MASLWR Experimental Test Facility

Table 3

OSU-MASLWR-002 and OSU-MASLWR-003A test conditions [8, 11, 12].

TestPrimarySecondary
Start time
(s)
End time
(s)
Core power (kW)T_in
(K)
T_out
(K)
Flow
(L/min)
Vel
(m/s)
T_in
(K)
T_out
(K)
P
(MPa)
Feedwater
(kg/min)

002012780.048950665.60.132924821.411.13
250550100.049150977.90.162924881.401.81
7501200100.049050880.00.162924941.382.14
13801570100.048650581.90.172924941.372.50
16701920110.048350384.90.172924931.362.49
20602250125.048250388.50.182924931.352.50
24502600160.0481505104.10.212924881.363.85
27002930165.0478503105.00.212934821.353.83

003A0450210.05015281180.242935071.5814.14
5501000210.04995261200.242935091.5674.56