Research Article

Preliminary Assessment of the Possible BWR Core/Vessel Damage States for Fukushima Daiichi Station Blackout Scenarios Using RELAP/SCDAPSIM

Figure 19

Maximum bundle temperature and water levels for scenarios with depressurization and termination of emergency water injection at 4.2, 11.8, and 19.6 hours after reactor scram (CRD flows maintained).
646327.fig.0019