| No. of tests | Project identification | Test acronym | Dateof tests | ECCS configuration and/or main objectives |
| (1) | IAEA-SPE | SPE-1 | 1986 | Minimum ECCS configuration: 0 SIT and 1 HPIS | (2) | ATKP-2 | SPE-ROV | 1987 | Without ECCS: 0 SIT, 0 HPIS and 0 LPIS, onset of core dryout | (3) | ATKP-2 | PAV-CM | 1987 | DBA case with ECCS configuration: 3 SITs and 1 HPIS, late SIT actuation | (4) | IAEA-SPE | SPE-2 | 1987 | DBA case with ECCS configuration: 3 SITs and 1 HPIS, nominal initial power, and delayed steam dump | (5) | OKKFT G-11 | SP0 | 1988 | DBA case with ECCS configuration: 3 SITs and 1 HPIS, HL/CL connection | (6) | OMFB 00307/91 | OM1-BF | 1992 | ECCS configuration: 3 SITs, 0 HPIS, 1 LPIS | (7) | OMFB 00307/91 | OM1-G0 | 1992 | DBA case with ECCS configuration: 3 SITs and 0 HPIS AM actions, reference case, secondary bleed and feed | (8) | OMFB 00307/91 | OM1-G1 | 1992 | DBA case with ECCS configuration: 3 SITs and 0 HPIS AM actions, noncondensables, secondary bleed and feed | (9) | OMFB 00307/91 | OM1-G2 | 1992 | DBA case with ECCS configuration: 3 SITs, 0 HPIS, 1 LPIS AM actions, noncondensables, secondary bleed and feed | (10) | IAEA-SPE | SPE-4 | 1993 | DBA case with ECCS configuration: 3 SITs, 0 HPIS, 1 LPIS AM actions, secondary bleed and feed | (11) | PHARE SRR3/95 | PHS-BF | 1999 | DBA case with ECCS configuration: 3 SITs, 0 HPIS, 1 LPIS AM actions, primary and secondary bleed and feed | (12) | IMPAM-VVER | IMP-21 | 2003 | ECCS configuration: 0 HPIS, 3 SITs, 1 LPIS AM actions: primary bleed and feed, with low pressuriser level | (13) | IMPAM-VVER | IMP-22 | 2004 | ECCS configuration, 0 HPIS, 3 SITs, 1 LPIS AM actions: primary bleed and feed, early actuation | (14) | IMPAM-VVER | IMP-23 | 2004 | ECCS configuration, 0 HPIS, 3 SITs, 1 LPIS AM actions: primary bleed and feed, a counterpart test to PACTEL, low SIT pressure | (15) | IMPAM-VVER | IMP-32 | 2004 | ECCS configuration: 0 HPIS, 3 SITs, 1 LPIS AM actions: primary bleed and feed, a counterpart test to PACTEL |
|
|