Research Article

PMK-2, the First Integral Thermal-Hydraulics Tests for the Safety Evaluation of VVER-440/213 Nuclear Power Plants

Table 7

Cladding temperatures in OAH-C1 test.

IdentificationLocation rod no./elevation
ā€”/m
Temperature excursionTime
s
LE11
m
Temperature
K

TE146/2.994Starts11312.774543.4
normalMax.11562.761628.4
End11752.696549.9

TE1511/3.444Starts11182.968544.4
wall1. max.11803.232684.0
2. max.12633.210692.7
3. max.15152.970718.0
End15852.874546.0

TE161/3.444Starts11192.947544.7
central1. max.11793.144697.0
2. max.12603.145702.4
3. max.15152.970739.2
End15923.141546.0

TE1716/3.444Starts11153.021544.4
corner1. max.11793.144680.7
2. max.12593.068681.7
3. max.15142.886713.2
End15852.874546.0

TE182/3.444Starts11172.985544.4
normal1. max.11803.232701.0
2. max.12613.184708.7
3. max.15152.970737.7
End15903.006546.0

TE193/3.444Starts11172.985544.4
normal1. max.11793.144711.0
2. max.12613.145712.4
3. max.15142.886742.0
end15553.007546.0