Science and Technology of Nuclear Installations / 2013 / Article / Fig 1

Research Article

Solution Monitoring Evaluated by Proliferation Risk Assessment and Fuzzy Optimization Analysis for Safeguards in a Reprocessing Process

Figure 1

Schematics of SM composed of three dip tubes inserted into tank, each of which measures three pressures at different heights inside the tank. The calibration equation is decided as a function of the solution level and temperature beforehand.
590684.fig.001

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.