Science and Technology of Nuclear Installations / 2013 / Article / Fig 5

Research Article

Solution Monitoring Evaluated by Proliferation Risk Assessment and Fuzzy Optimization Analysis for Safeguards in a Reprocessing Process

Figure 5

Proliferation risk analysis in the typical PUREX process composed of the total 43 process steps from the spent fuel pond to the product storage tank. The failure, success, and detection probabilities are expressed at the individual process step number.
590684.fig.005

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.