Research Article
Applying UPC Scaling-Up Methodology to the LSTF-PKL Counterpart Test
Table 4
Main events of PKL G7.1 Test.
| ā | Experimental (s) | UPC 1D nodalization (s) | UPC pseudo-3D nodalization (s) |
| Start of the transient | 0 | 0 | 0 | Beginning of core uncovery | 940 | 800 | 940 | Primary pressure below secondary pressure | 1020 | 920 | 1010 | Secondary-side depressurization | 1360 | 1190 | 1295 | Start of accum. injection | 1500 | 1304 | 1450 | ACC injection finished | 1860 | 1712 | 1752 | LPSI started | 2060 | 1966 | 1993 | End of the test | 5685 | 5685 | 5685 |
|
|