Nuclear Power Plant Maintenance Optimization with Heuristic Algorithm
Table 7
Obtained optimal test placement times for case scenario 2, no constraints considered.
| No. | Basic event | TP (hr) |
| 1 | AFW-TDP-FR-2P6HR | 590.51 | 2 | AFW-MDP-FR-3A6HR | 2067.71 | 3 | AFW-MDP-FR-3B6HR | 535.95 | 4 | AFW-CKV-OO-CV142 | 917.45 | 5 | AFW-CKV-OO-CV172 | 280.32 | 6 | AFW-CKV-OO-CV157 | 61.18 | 7 | ACP-BAC-ST-4KV1H | 1178.26 | 8 | ACP-BAC-ST-4KV1J | 2169.04 | 9 | DCP-BDC-ST-BUS1A | 970.98 | 10 | DCP-BDC-ST-BUS1B | 816.23 |
| (hr) | 2187.71 | SET (hr) | 7481.65 | | |
|
|