Obtained optimal test placement times for case scenario 2 with consideration of the
and time interval
.
| No. | Basic event | TP (hr) |
| 1 | AFW-TDP-FR-2P6HR | 406.98 | 2 | AFW-MDP-FR-3A6HR | 523.91 | 3 | AFW-MDP-FR-3B6HR | 414.87 | 4 | AFW-CKV-OO-CV142 | 1630.45 | 5 | AFW-CKV-OO-CV172 | 1480.61 | 6 | AFW-CKV-OO-CV157 | 1191.79 | 7 | ACP-BAC-ST-4KV1H | 631.79 | 8 | ACP-BAC-ST-4KV1J | 1106.65 | 9 | DCP-BDC-ST-BUS1A | 932.80 | 10 | DCP-BDC-ST-BUS1B | 1135.33 |
| (hr) | 1750.45 | SET (hr) | 2465.93 | | |
|
|