Research Article

A Nuclear Reactor Transient Methodology Based on Discrete Ordinates Method

Table 6

Results for different mesh size during ramp perturbation.

1 cm2 cm4 cm8 cmReference

0 s11111
0.1 s1.3151.3161.3161.3121.307
0.2 s1.9921.9931.9901.9751.957
0.3 s2.1182.1192.1152.0972.074
0.4 s2.1362.1372.1342.1152.096
0.5 s2.1552.1562.1522.1332.109
Calculation time (s)16303918324