Procedure of Active Residual Heat Removal after Emergency Shutdown of High-Temperature-Gas-Cooled Reactor
Figure 7
Temperature transient of boiling tube (steam outlet), with 30 s delay of helium circulation; helium flow rate: 10% design value; feed water temperature: 105°C; and pressure: 13.9 MPa.