Research Article
Procedure of Active Residual Heat Removal after Emergency Shutdown of High-Temperature-Gas-Cooled Reactor
Table 1
Design parameters of HTR-PM.
| Parameters | Design value |
| Primary loop | | Helium pressure | 7.0 MPa | Helium temperature at reactor outlet | 750°C | Helium temperature at reactor inlet | 250°C | Helium flow rate | 176 kg/s | Secondary loop | | Steam pressure at SG outlet | 13.9 MPa | Steam temperature at SG outlet | 570°C | Feed water temperature | 205°C | Feed water flow rate | 155.4 kg/s | Start-up loop | | Coolant pressure | 1.0 MPa | Steam at electrical boiler outlet | 140~200°C | Maximum steam flow rate | 9.7 kg/s |
|
|