Research Article

Delayed Station Blackout Event and Nuclear Safety

Table 10

Basic events with the largest FV importance measure, model with 15-minute delay.

NumberNameDescriptionNom. valueFVRDFRIF

1LOOPLoss of off-site power IE7,70E − 022,35E − 011,31E + 00Infinite
2S1Medium LOCA IE1,00E − 032,10E − 011,27E + 00Infinite
3AFW-XHE-FO-U1SBOOperator failure to start AFW8,20E − 021,40E − 011,15E + 002,49E + 00
4AFW-TDP-FR-2P6HRAFW failure to run3,00E − 021,32E − 011,15E + 005,25E + 00
5RManual reactor scram1,70E − 011,31E − 011,15E + 001,64E + 00
6ATWSAnticipated transient WS IE5,00E − 041,31E − 011,15E + 00Infinite
7HPI-XHE-FO-FDBLDOperator failure feed/bleed 7,10E − 021,30E − 011,15E + 002,70E + 00
8VInterfacing LOCA IE1,60E − 061,05E − 011,12E + 00Infinite
9T2Loss of main FW IE9,40E − 019,56E − 021,11E + 00Infinite
10RECOV-S1-2Operator recovery action9,29E − 018,51E − 021,09E + 001,01E + 00