Research Article

A Flooding Induced Station Blackout Analysis for a Pressurized Water Reactor Using the RISMC Toolkit

Table 5

Summary of the statistical analysis for 100% and 120% power levels.

BranchOutcome100%120%
CounterProbabilityCounterProbability

1OK36570.974036570.9740
2OK276418.32 10−3250018.17 10−3
3OK24037.498 10−322397.344 10−3
4CD1176217.8 10−61604522.2 10−6