Research Article
A Flooding Induced Station Blackout Analysis for a Pressurized Water Reactor Using the RISMC Toolkit
Table 5
Summary of the statistical analysis for 100% and 120% power levels.
| Branch | Outcome | 100% | 120% | Counter | Probability | Counter | Probability |
| 1 | OK | 3657 | 0.9740 | 3657 | 0.9740 | 2 | OK | 2764 | 18.32 10−3 | 2500 | 18.17 10−3 | 3 | OK | 2403 | 7.498 10−3 | 2239 | 7.344 10−3 | 4 | CD | 1176 | 217.8 10−6 | 1604 | 522.2 10−6 |
|
|