Research Article
Uncertainty Analysis of the Potential Hazard of MCCI during Severe Accidents for the CANDU6 Plant
Table 1
Timings of key events for the station blackout scenario base case in the Wolsong-1 plant (based on ISAAC calculation).
| Event | Time (base case) | hours, (seconds) |
| SG inventory depletion | 2.8 (10,032) | Pressure tube rupture | 4.0 (14,272) | CFVS first open | 6.7 (24,034) | Calandria vessel inventory depletion | 11.5 (41,558) | Calandria vessel failure | 45.6 (164,188) | Calandria vault inventory depletion | 49.3 (177,502) | Calandria vault floor rupture | 101.0 (363,473) | Reactor building failure | 102.4 (368,484) |
|
|